For a new industrial building in Deinze, Pluvio installed an infiltration system in collaboration with Grond- en dem demolition works Van Gheluwe. 76 tunnels were placed in two rows for an infiltration volume of 161m³. This project was completed in one morning.
Our cooperation with Casteleyn & Sons included the successful implementation of two oil separators.
For a new shopping center in Bruges, an infiltration system was installed by Pluvio in collaboration with groundworks Casteleyn.
The project required an infiltration volume of 25.44m³. For this we placed 12 tunnels in 3 rows.
For the Roc training center in Roeselare, an infiltration system was provided by Pluvio.
There were 14 tunnels placed in one row along the building. This accounts for a volume of 29.68m³.
The Infiltration volume for this project was 350m³. For this we placed 142 tunnels in cooperation with earthworks Denys. This project was placed by two earthworkers in no less than two days.
You can also come to us for a small project. We installed a Pluvio infiltration system for the overflow of a swimming pool at a private home.
When infiltration is not possible, the Pluvio tunnels can function as a buffer system with delayed discharge. Installation is done in the same way as an infiltration system. The only difference is that the geotextile in the construction pit is replaced by an epdm foil. This foil does not allow water to pass through and buffers the water in the tunnels and the crushed stone around it. For the Project in AZ Delta, this system was installed in cooperation with earthworks Casteleyn. This required 13 tunnels for a buffer volume of 27.56 m³.
For the new Delhaize in Waregem, Pluvio installed the infiltration system under the car park. In this way, a lot of space was saved. Due to the large amount of space, the tunnels could be laid in 5 rows.
For the construction of a new car park of the VTI school, Pluvio provided the infiltration system. For this project, 27,560 litres had to be infiltrated. For this, we installed 13 infiltration tunnels in two rows. The groundworkers were very satisfied with the ease of installation.
This project was carried out in collaboration with earthworks Vereecke. The infiltration volume for this project was 174m³. This required 82 tunnels. As the customer had sufficient space in the length, two long rows of tunnels were laid.